Arboricultural Method Statement

Once proposals have been finalised the local authority may require an approved Arboricultural Method Statement in order to ensure that trees are not damaged during construction. Issues addressed include the following:


*
Installation of underground and over-ground services
Sympathetic road construction techniques
Protective fencing specification
Land regarding
Necessary tree pruning
Storage of materials and siting of cabins
Handling of materials hazardous to tree health
Movement of heavy machinery and soil compaction

*


Adherence to the approved Arboricultural Method Statement may be conditional upon Planning Consent. The Local Authority have the power of enforcement via fines and cessation of works.

It is essential that a realistic and viable Arboricultural Method Statement is produced at the outset which balances the practical requirements of developers with those of the Local Authority. Having considerable experience of the construction industry, Crown Consultants are able to achieve this objective and help to avoid expensive fines and delays.



The Tree Protection Plan

Accompanying the Arboricultural Method Statement is a Tree Protection Plan. This identifies areas where special ground protection is needed, where protective fencing shall be installed, where underground services shall run etc.

Download Example Tree Protection Sign (21KB .pdf)

Crown Consultants Limited

Crown Arboricultural Consultants


Tree surveys for a wide variety of satisfied clients throughout England and Wales.

Judge the standard of our tree reports by clicking the quality button above.


Freephone
08000 14 13 30

For a free, instant quote